四级冲刺练习阅读75

  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

主站蜘蛛池模板: 亚洲国产成人精品小蝌蚪 | 专干老熟女视频在线观看 | 国产精品15p| 男人天堂视频网站 | 久久一区二区三区免费 | 精品一区二区三区影片 | 久久99精品视频 | 99久久国内精品成人免费 | www国产亚洲精品久久 | 激情毛片视频 | av一本久道久久综合久久鬼色 | 亚洲熟妇无码一区二区三区 | 日产精品99久久久久久 | 一区二区三区高清在线观看 | 福利午夜影院 | 免费大学生国产在线观看p 免费的a级毛片 | 亚洲熟女乱色综合亚洲小说 | 狠狠躁夜夜躁人人爽超碰97香蕉 | 人妻熟妇乱又伦精品视频app | 国产亚洲欧美一区 | 在线天堂中文www官网 | 一级黄色片免费播放 | 国产精品毛片无遮挡高清 | 亚洲欧美乱综合图片区小说区 | 精品人妻无码区在线视频 | 国产精品久久久久aaaa | 日日干视频 | 久久久精品免费热线观看 | 天天操天天插天天射 | 曰本无码人妻丰满熟妇啪啪 | 亚洲国产成人av在线观看 | 亚洲欧美另类视频 | 欧美专区一区二区三区 | 午夜欧美精品久久久久久久 | 日日碰狠狠躁久久躁综合网 | 男人靠女人的免费视频 | 青青久久国产成人免费网站 | 女人被做到高潮免费视频 | 欧美日韩综合一区二区三区 | 伊人一伊人色综合网 | 点击进入不卡毛片免费观看 |