  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

主站蜘蛛池模板: 日韩欧美亚洲 | 99热一区| 久久蜜桃| 午夜影院普通用户体验区 | 无限资源在线观看第页 | 国产在线观看网址你懂得 | 亚洲综合国产 | 伊人国产在线播放 | 4438成人成人高清视频 | 男女互操网站 | 日本久久久久一级毛片 | 亚洲乱码无码永久不卡在线 | 一区视频在线播放 | 99草在线视频 | 亚洲aⅴ在线无码播放毛片一线天 | 一本色道久久爱88av | 欧美性受xxxx黑人猛交 | 国产精品一区二区三区四区 | 日本在线网站 | 男同gay毛片免费可播放 | 国产无限资源 | 亚洲色欲久久久久综合网 | 黑人上司粗大拔不出来电影 | 欧美综合色另类图片区 | av无码国产精品色午夜 | 狠狠色噜噜狠狠狠狠97俺也去 | 国内精品视频 在线播放 | 禁成人动漫在线观看 | 国产高清在线观看 | 五月天激情小说 | 日韩免费无码一区二区视频 | 亚洲一区二区三区四区五区黄 | 国产一区二区三区成人久久片 | 亚洲精品国产精品国自产 | 色偷偷偷久久伊人大杳蕉 | 亚洲色欲一区二区三区在线观看 | 人人妻人人爽人人做夜欢视频九色 | a久久99精品久久久久久不 | 午夜精品久久久久久中宇 | 国产日产韩国精品视频 | 久久毛片基地 |