曰韩免费_91久久精品国产亚洲_一区二区成人影院_九一视频在线免费观看_91国视频_亚洲成人中文在线

看雅思文章背雅思词汇:AIRPORTS ON WATER

雕龙文库 分享 时间: 收藏本文

看雅思文章背雅思词汇:AIRPORTS ON WATER

  AIRPORTS ON WATER

  River deltas are difficult places for map makers. The river builds them up, the sea wears them down ; their outline s are always changing. The changes in Chinas Pearl River delta, however, are more dramatic than these natural fluctuations. An island six kilometers long and with a total area of 1248 hectares is being created there. And the civil engineers are as interested in performance as in speed and size. This is a bit of the delta that they want to endure.

  The new island of Chek Lap Kok, the site of Hong Kongs new airport, is 83% complete. The giant dumper trucks rumbling across it will have finished their job by the middle of this year and the airport itself will be built at a similarly breakneck pace.

  As Chek Lap Kok rises, however, another new Asian island is sinking back into the sea. This is a 520-hecrare island built in Osaka Bay, Japan, that serves as the platform. for the new Kansai airport. Chek Lap Kok was built in different way, and thus hopes to avoid the same sinking fate.

  The usual way to reclaim land is to pile sand rock on to the seabed. When the sealed oozes with mud, this is rather like placing a textbook on a wet sponge: the weight squeezes the water out, causing both water and sponge to settle lower. The settlement is rarely even: different parts sink at different rates. So buildings, pipes, roads and so on tend to buckle and crack. You can engineer around these problems, or you can engineer them out. Kansai took the first approach; Chek Lap Kok is taking the second.

  The differences are both political and geological. Kansai was supposed to be built just one kilometer offshore, where the seabed is quite solid. Fishermen protested, and the site was shifted a further five kilometers. That put it in deeper water and above a seabed that consisted of 20 metres of soft alluvial silt and mud deposits. Worse, below it was a not-very-firm glacial deposit hundreds of metres thick.

  The Kansai builders recognized that settlement was inevitable. Sand was driven into the seabed to strengthen it before the landfill was piled on top, in an attempt to slow the process; but this has not been as effective as had been hoped. To cope with settlement, Kansais giant terminal is supported on 900 pillars. Each of them can be individually jacked up, allowing wedges to be added underneath. That is meant to keep the building level. But it could be a tricky task.

  Conditions are different at Chek Lap Kok. There was some land there to begin with, the original little island of Chek Lap Kok and a smaller outcrop called Lam Chau. Between them, these two outcrops of hard, weathered granite make up a quarter of the new islands surface area. Unfortunately, between the islands there was a layer of soft mud, 27 metres thick in places.

  According to Frans Uiterwijk, a Dutchman who is the projects reclamation director, it would have been possible to leave this mud below the reclaimed land, and to deal with the resulting settlement by the Kansai method. But the consortium that won the contract for the island opted for a more aggressive approach, It assembled the worlds largest fleet of dredgers, which sucked up 150m cubic metres of clay and mud and dumped it in deeper waters. At the same time, sand was dredged from the waters and piled on top of the layer of stiff clay that the massive dredging had laid bare.

  Nor was the sand the only thing used. The original granite island which had hills up to 120 metres high was drilled and blasted into boulders no bigger than two metres in diameter. This provided 70m cubic metres of granite to add to the islands foundations. Because the heap of boulders does not fill the space perfectly, this represents the equivalent of 105m cubic metres of landfill. Most of the rock will become the foundations for the airports runways and its taxiways. The sand dredged from the waters will also be used to provide a two-metre capping layer over the granite platform. This makes it easier for utilities to dig trenchesgranite is unyielding stuff. Most of the terminal buildings will be placed above of pile-driving foundations above softer areas.

  The completed island will be six to seven metres above sea level. In all. 350m cubic metres of material will have been moved. And much of it, like the overloads, has to be moved several times before reaching its final resting place. For example, there has to be a motorway capable of carrying 150-tonne dump-trucks; and there has to be a raised area for the 15,000 construction workers. These are temporary; they will be removed when the airport is finished.

  The airport, though, is here to stay. To protect it, the new coastline is being bolstered with a formidable twelve kilometres of sea defenses. The brunt of a typhoon will be deflected by the neighbouring island of Lantau; the sea walls should guard against the rest. Gentler but more persistent bad weatherthe downpours of the summer monsoonis also being taken into account. A mat-like material called geo-textile is being laid across the island to separate the rock and sand layers. That will stop sand particles from being washed into the rock voids, and so causing further settlement. The island is being built never to be sunk.

  delta n.

  1.the fourth letter of the Greek alphabet希腊字母表的第四个字母。

  2.triangular area of alluvial land at a rivers mouth, enclosed or crossed by branches of the rivers.三角洲

  the Nile Delta 尼罗河三角洲

  wear sth. down: become gradually smaller, thinner, etc.使某物逐渐变小,变细,变薄等。

  outline:

  1.lines showing the shape or outer edge of sth.轮廓,外形

  She could see only the outlines of the trees in the dim light. 朦胧中,她只看到树木的轮廓。

  2.statement of the main facts or points要点,大纲,摘要

  an outline of an essay/ a lecture

  dramatic:

  1.of drama.戏剧的

  a dramatic society 戏剧协会

  2. exciting or impressive 戏剧性的,激动人心的,给人深刻印象的

  dramatic changes, development, news 激动人心的变化,发展,资讯

  fluctuate

   n.变化,波动

  wide fluctuations of temperature. 温度的巨大变化

  hectare

  measure of area in the metric system, equal to 100 ares or 10000 square metres. 公顷

  

  AIRPORTS ON WATER

  River deltas are difficult places for map makers. The river builds them up, the sea wears them down ; their outline s are always changing. The changes in Chinas Pearl River delta, however, are more dramatic than these natural fluctuations. An island six kilometers long and with a total area of 1248 hectares is being created there. And the civil engineers are as interested in performance as in speed and size. This is a bit of the delta that they want to endure.

  The new island of Chek Lap Kok, the site of Hong Kongs new airport, is 83% complete. The giant dumper trucks rumbling across it will have finished their job by the middle of this year and the airport itself will be built at a similarly breakneck pace.

  As Chek Lap Kok rises, however, another new Asian island is sinking back into the sea. This is a 520-hecrare island built in Osaka Bay, Japan, that serves as the platform. for the new Kansai airport. Chek Lap Kok was built in different way, and thus hopes to avoid the same sinking fate.

  The usual way to reclaim land is to pile sand rock on to the seabed. When the sealed oozes with mud, this is rather like placing a textbook on a wet sponge: the weight squeezes the water out, causing both water and sponge to settle lower. The settlement is rarely even: different parts sink at different rates. So buildings, pipes, roads and so on tend to buckle and crack. You can engineer around these problems, or you can engineer them out. Kansai took the first approach; Chek Lap Kok is taking the second.

  The differences are both political and geological. Kansai was supposed to be built just one kilometer offshore, where the seabed is quite solid. Fishermen protested, and the site was shifted a further five kilometers. That put it in deeper water and above a seabed that consisted of 20 metres of soft alluvial silt and mud deposits. Worse, below it was a not-very-firm glacial deposit hundreds of metres thick.

  The Kansai builders recognized that settlement was inevitable. Sand was driven into the seabed to strengthen it before the landfill was piled on top, in an attempt to slow the process; but this has not been as effective as had been hoped. To cope with settlement, Kansais giant terminal is supported on 900 pillars. Each of them can be individually jacked up, allowing wedges to be added underneath. That is meant to keep the building level. But it could be a tricky task.

  Conditions are different at Chek Lap Kok. There was some land there to begin with, the original little island of Chek Lap Kok and a smaller outcrop called Lam Chau. Between them, these two outcrops of hard, weathered granite make up a quarter of the new islands surface area. Unfortunately, between the islands there was a layer of soft mud, 27 metres thick in places.

  According to Frans Uiterwijk, a Dutchman who is the projects reclamation director, it would have been possible to leave this mud below the reclaimed land, and to deal with the resulting settlement by the Kansai method. But the consortium that won the contract for the island opted for a more aggressive approach, It assembled the worlds largest fleet of dredgers, which sucked up 150m cubic metres of clay and mud and dumped it in deeper waters. At the same time, sand was dredged from the waters and piled on top of the layer of stiff clay that the massive dredging had laid bare.

  Nor was the sand the only thing used. The original granite island which had hills up to 120 metres high was drilled and blasted into boulders no bigger than two metres in diameter. This provided 70m cubic metres of granite to add to the islands foundations. Because the heap of boulders does not fill the space perfectly, this represents the equivalent of 105m cubic metres of landfill. Most of the rock will become the foundations for the airports runways and its taxiways. The sand dredged from the waters will also be used to provide a two-metre capping layer over the granite platform. This makes it easier for utilities to dig trenchesgranite is unyielding stuff. Most of the terminal buildings will be placed above of pile-driving foundations above softer areas.

  The completed island will be six to seven metres above sea level. In all. 350m cubic metres of material will have been moved. And much of it, like the overloads, has to be moved several times before reaching its final resting place. For example, there has to be a motorway capable of carrying 150-tonne dump-trucks; and there has to be a raised area for the 15,000 construction workers. These are temporary; they will be removed when the airport is finished.

  The airport, though, is here to stay. To protect it, the new coastline is being bolstered with a formidable twelve kilometres of sea defenses. The brunt of a typhoon will be deflected by the neighbouring island of Lantau; the sea walls should guard against the rest. Gentler but more persistent bad weatherthe downpours of the summer monsoonis also being taken into account. A mat-like material called geo-textile is being laid across the island to separate the rock and sand layers. That will stop sand particles from being washed into the rock voids, and so causing further settlement. The island is being built never to be sunk.

  delta n.

  1.the fourth letter of the Greek alphabet希腊字母表的第四个字母。

  2.triangular area of alluvial land at a rivers mouth, enclosed or crossed by branches of the rivers.三角洲

  the Nile Delta 尼罗河三角洲

  wear sth. down: become gradually smaller, thinner, etc.使某物逐渐变小,变细,变薄等。

  outline:

  1.lines showing the shape or outer edge of sth.轮廓,外形

  She could see only the outlines of the trees in the dim light. 朦胧中,她只看到树木的轮廓。

  2.statement of the main facts or points要点,大纲,摘要

  an outline of an essay/ a lecture

  dramatic:

  1.of drama.戏剧的

  a dramatic society 戏剧协会

  2. exciting or impressive 戏剧性的,激动人心的,给人深刻印象的

  dramatic changes, development, news 激动人心的变化,发展,资讯

  fluctuate

   n.变化,波动

  wide fluctuations of temperature. 温度的巨大变化

  hectare

  measure of area in the metric system, equal to 100 ares or 10000 square metres. 公顷

  

主站蜘蛛池模板: 鲁鲁狠色综合色综合网站 | 亚洲黄a| 国产做爰全免费视频美女 | 亚洲日韩欧美一区久久久久我 | 亚洲在线视频免费 | 真实偷清晰对白在线视频 | 免费乱理伦片在线观看 | 女人高潮内射99精品 | 久久伊人天堂视频网 | www.在线免费观看 | 成人毛片av免费 | 国产精品卡一卡二卡三 | 亚洲 欧美 国产 日韩 精品 | 色94色欧美sute亚洲线路一 | 亚洲爱爱天堂 | 男女人本色免费在线观看视频 | 精品国产免费久久久久久 | 亚洲乱码在线观看 | 在线欧美精品一区二区三区 | 成人影片麻豆国产影片免费观看 | 午夜人成| 国产成人精品免费视频app软件 | 国产短视频精品一区二区三区 | 一区二区三区四区在线播放 | 国产成人综合久久精品亚洲 | 永久免费不卡在线观看黄网站 | 国产精品国产三级区别第一集 | 国产精品资源手机在线播放 | 无码人妻av一区二区三区蜜臀 | 久久人人爽av亚洲精品天堂 | 思思99热久久精品在线6 | 在线精品国精品国产不卡 | 香港一级毛片免费看 | 精品久久久中文字幕人妻 | 无码日韩人妻精品久久蜜桃 | 亚洲色大成网站www永久麻豆 | 欧美日韩亚洲精品国产色 | 老司机午夜精品视频在线观看免费 | 亚洲人色婷婷成人网站在线观看 | 国产精品视频公开费视频 | 男人狂躁进女人下面免费视频 |